|
|||||||
B11K-A Jacket Dec 2007 - Oct 2008 Client : Sarawak Shell Berhad Location : MMHE Yard
The B11K-A substructure was installed at the B11 field in 94.1 meter water depth, located 170 km north of Bintulu offshore Sarawak on April 14, 2009. It was completed in October 2008 and clocked 745,588 man-hours with Zero Loss Time Injury (LTI) and recorded 0.26% of welding repair rate.
|
|||||||
Copyright © Multitask Holdings Sdn. Bhd. 2009. All Rights Reserved. Design & Maintain by aiM |