Chad Tower Yoke

Jun 2002 - Feb 2003

Client : FMC Inc.

Location : MMHE Yard

 

The Chad/Cameroon Development project consists of a combined 365 oil well inland reserve, 1070 kilometers pipeline

and marine offloading terminal located in Southern Chad and west coast Cameroon. Operator Esso -Chad and its

partners opted for a ship -shaped Floating, Storage, and Offloading System (FSO) as the preferred marine terminal offloading alternative. The FSO includeda SOFEC designed Tower Yoke Mooring System.

Multitask personnel played a vital role the construction of the Tower Yoke system at Malaysian Shipyard and Engineering

in Johor Bahru, Malaysia, Engaged in the contract positions of Tower Yoke and E&I Construction,
Acquaint personnel supervised both the site mechanical outfitting activities.

 

 

 

 

 

 

 

 


 